Charles Armstrong School

Belmont, CA

Fisher has completed three summer projects at Charles Armstrong. The Summer 2014 outdoor learning facility had the added challenge of a planned shut down in July to accommodate summer school. Scope included demolition and site work, installation of new systems including drainage, irrigation, a bioswale plus new plantings, a concrete sidewalk, Ipe deck, built-in benches and a fountain. The 2015 project focused on constructing a new amphitheater and pavilion with an elaborate shade structure. Fisher also built a new Ipe deck, resurfaced the sport court and installed a custom play structure. Finally, our team reconfigured two classrooms for the middle school. The summer 2016 scope includes the construction of an outdoor art/garden space, a new parking lot and reconfiguring two classrooms.

Client / Owner

Charles Armstrong School

Architect

Studio Five Design

Duration

7 weeks (2014) and 11 weeks (2015)

Completion Date

August 2018

Size(SF)

50,000

Market Sector

Education

Project Type

Core + Shell

Ground Up

Tenant Improvement

Fisher

Location

601 California Street, Suite 300
San Francisco, CA 94108

Connect With Us